The 750-Berth Plan: Why La Bajadilla Could Reshape Central Marbella

Marbella’s La Bajadilla harbour is moving from a 268-berth working port towards an approximately 750-berth marina backed by more than €200 million of planned investment. The property story is not a guaranteed uplift: it is what a much larger waterfront amenity could change for central and eastern Marbella.

The 750-Berth Plan: Why La Bajadilla Could Reshape Central Marbella

At a glance

  • Marbella’s Puerto de la Bajadilla is set to expand from 268 berths to approximately 750 under a project carrying more than €200 million of planned investment.
  • The new marina is designed for vessels of up to 70 metres, with the protected water area increasing by almost 3.5 times.
  • The engineering plan includes a 1.13 km main breakwater, a 450 m counter-breakwater and a new groyne at Arroyo Primero.
  • The wider scheme includes around 1,000 parking spaces, commercial space, fishing facilities and a boatyard, as well as beach-sand management measures along four Marbella beaches.
  • Playa Bajadilla-Puertos averaged €6,650/m² in August 2026 asking prices, compared with €5,956/m² across Marbella and €5,170/m² in Marbella Pueblo.
  • Bottom line: La Bajadilla is not an instant property-price story; it is a major piece of waterfront infrastructure that could make the eastern edge of central Marbella materially more useful, connected and visible.

Marbella has spent sixteen years waiting for a plan at Puerto de la Bajadilla to become more than a drawing. On 2 September 2026, that changed. The Junta de Andalucía confirmed the award of a new concession for a project expected to invest more than €200 million in the harbour and take its capacity from 268 berths to approximately 750. The new operator is due to take control of the existing port on 1 January 2027.

For a property buyer, the interesting part is not simply that Marbella will have more places to moor boats. La Bajadilla sits at the eastern edge of the urban centre, beside the beaches and residential streets that connect Marbella Pueblo with El Cable and, further east, Río Real. If the project is delivered broadly as announced, a waterfront that has long felt more functional than polished will gain a much larger marina, substantial parking, commercial activity, a working boatyard and infrastructure for larger yachts. That is an urban change as much as a nautical one.

It is also a useful test of how buyers should read big infrastructure announcements on the Costa del Sol. The right question is not “how much will prices rise?” There is no honest percentage for that. The better question is what daily inconvenience disappears, what new activity arrives and whether the surrounding district becomes more attractive for the way a second-home owner or permanent resident actually uses Marbella.

Sixteen Years of Paperwork, Then a Very Different Port

La Bajadilla today is a mixed sporting and fishing harbour rather than a luxury marina masquerading as a shopping centre. Marbella’s own tourism information lists 268 berths, and the working character remains obvious around the fishing quay, service areas and boatyard. That is part of the place’s identity, and the newly announced scheme is not designed to erase it: the published project retains fishing facilities and a varadero alongside the expanded leisure marina.

What changes is the scale. The Junta says the protected water area will increase by almost three and a half times. Berths rise by roughly 482, or about 180% relative to today’s 268. The new marina is intended to accommodate leisure craft through to large yachts of up to 70 metres, placing La Bajadilla in a different operating category from the existing harbour.

The significance of the September decision is therefore less the promise — versions of an expanded port have circulated for years — than the administrative step. Regional authorities say the project was first tendered 16 years ago, later stalled, and was taken up again in 2019 through environmental, coastal and legal procedures before the new concession was awarded. A January 2027 takeover does not mean a finished 750-berth marina in January. It does mean the project has moved into a more concrete phase than the long period in which buyers could reasonably treat La Bajadilla expansion as background noise.

Not Puerto Banús 2.0 — and That Is the Point

The temptation is to describe every ambitious marina west of Málaga as “the next Puerto Banús”. It is usually lazy shorthand. Puerto Banús has had more than half a century to build a global identity around luxury retail, nightlife and the spectacle of the quayside. Its own current information lists more than 900 berths — 915 in its 2026 published material — across 15 hectares of sheltered water, with close to 100 luxury boutiques and millions of annual visitors.

La Bajadilla has a different opportunity. It is much closer to Marbella’s traditional town centre and Old Town, and it begins with a working harbour rather than a purpose-built luxury enclave. The proposed mix of marina, fishing activity, commercial space, boatyard and parking could give it a more everyday role. For buyers who like central Marbella but do not necessarily want the full Puerto Banús experience outside the front door, that distinction matters.

Frequently Asked Questions

What is planned for Puerto de la Bajadilla in Marbella?

The approved concession envisages more than €200 million of investment to expand La Bajadilla from 268 to approximately 750 berths. The plan also includes larger breakwaters, commercial and service areas, fishing facilities, a boatyard and around 1,000 parking spaces.

When does the new La Bajadilla concession begin?

The Junta de Andalucía says the new concessionaire is due to take control of the existing facilities on 1 January 2027. That is the start of the new concession phase, not the date on which the fully expanded 750-berth marina will be finished.

How large will the expanded La Bajadilla marina be?

The published plan is for approximately 750 berths, compared with 268 today, and vessels of up to 70 metres. The protected water area is expected to increase by almost three and a half times.

Will La Bajadilla stop being a fishing port?

No. The publicly announced project includes dedicated fishing spaces alongside the expanded leisure marina, commercial areas and boatyard. La Bajadilla is therefore planned as a mixed-use port rather than a purely recreational marina.

Is La Bajadilla intended to replace Puerto Banús?

No. Puerto Banús is an established luxury destination with more than 900 berths and a very different commercial identity. La Bajadilla’s strength is its position beside central and eastern Marbella and its proposed mix of marina, fishing, boatyard, parking and public-facing waterfront uses.

Will the La Bajadilla expansion increase nearby property prices?

The project could improve the area’s amenity, visibility and waterfront infrastructure, but there is no reliable percentage uplift that can be attributed to the marina in advance. Buyers should assess the individual property, construction exposure, views, parking, condition and exact location rather than assume an automatic price gain.